(407) 426-9806

Tampa International Airport

Two 16” HDPE casings containing (4) 4” and (4) 3” stainless pipes in each casing were installed at the Tampa International Airport. The bores extended 400 feet with each casing weighing over 28,000 pounds. The bores were guided through various critical utilities,...