Installed over 3,000 feet of conduit for power and communications purposes at the Disney/MGM Studios in Orlando. The project consisted of pulling (4) 6” conduits in single bores. This project had a very tight timetable and required seven day work weeks with all work performed only within specified night hours with daily restoration to impeccable condition since the work was in an area normally open to the public. Due to the large number of existing utilities and limited information about their location Ground Penetrating Radar was used to verify unknown obstacles. The project was completed ahead of schedule and we received a commendation from Walt Disney World for our performance.