Over 3,000 feet of 4″ and 8″ welded rigid steel conduit was placed in a series of continuous bores at depths from 8′ to 12′. Bores varied between 200′ and 500′ in length. At times, both 4″ and 8″ conduit was pulled simultaneously. One bore crossed Interstate 95 and a second bore was completed underneath an earthen on-ramp which was 25′ in vertical height above the ground level at the point at which the bore crossed underneath.